Hi Everyone
Well all the old fireplaces have been removed, along with a lot of old plaster that was about to fall off, one of the bedroom ceilings is in a bad way and will need re plastering,we have worked out the house wiring as it stands and what need to be done with that, the lino tiled kitchen floor has been removed, a new doorway has been made from the kitchen through to the old outside loo room, this will be the laundry/boiler room when finished, the old bathroom has been stripped and this week the plumber is in residence fitting central heating and all the required plumbing,we have gained access to the loft and not to full of rubbish but the insulation is passed it's sell by date, so that has to be removed and new insulation laid, the chimneys now need capping off
Watch this space for details of how work progresses, now where is my bed
Well all the old fireplaces have been removed, along with a lot of old plaster that was about to fall off, one of the bedroom ceilings is in a bad way and will need re plastering,we have worked out the house wiring as it stands and what need to be done with that, the lino tiled kitchen floor has been removed, a new doorway has been made from the kitchen through to the old outside loo room, this will be the laundry/boiler room when finished, the old bathroom has been stripped and this week the plumber is in residence fitting central heating and all the required plumbing,we have gained access to the loft and not to full of rubbish but the insulation is passed it's sell by date, so that has to be removed and new insulation laid, the chimneys now need capping off
Watch this space for details of how work progresses, now where is my bed