Well last Friday the gas man came to call,not to fit the loft insulation but to survey the job, so not as explained to us on the phone, even though they knew the house was going through renovation he explained it could only be done afterwards, he then went upstairs and then said as the house had barrel ceilings they could not do the job, and off he went,so that was a waste of our time.

Several walls have now been painted in a white undercoat, the kitchen and bathroom is painted and the tiling in the shower is 50% complete, also the loo is fitted

Other walls have been rubbed down and filled where necessary ready for painting, all the floor carpets and coverings have been ordered

Only 5 weeks until the move
 
Well last Friday the gas man came to call,not to fit the loft insulation but to survey the job, so not as explained to us on the phone, even though they knew the house was going through renovation he explained it could only be done afterwards, he then went upstairs and then said as the house had barrel ceilings they could not do the job, and off he went,so that was a waste of our time.

....

Only 5 weeks until the move
Seems some companies can only cope with typical, anything unusal is beyond them.

I love it when they inist I need cavity wall insultation and do not believe me when I tell them it is solid walls - no gap between plaster and stone!
 
Well last Friday the gas man came to call,not to fit the loft insulation but to survey the job, so not as explained to us on the phone, even though they knew the house was going through renovation he explained it could only be done afterwards, he then went upstairs and then said as the house had barrel ceilings they could not do the job, and off he went,so that was a waste of our time.



Only 5 weeks until the move
Sounds like a cue for Michael Flanders and Donald Swann!!:36::42: T'was on a Friday morning that the gas-man came to call..................
 
Last edited: