Each week seems to be getting busier,still a lot to do and less than 4 weeks to make it happen.
Problems this week drilling 20 mm holes in the tile where the pipes feed the shower control, managed to break one tile, so we have sent off for a diamond drill, lets see how we get on with that
A lot more sanding and painting this week, the original wood around door frames and the staircase have come up very nicely after cleaning off many layers of paint, the doors go away this week for dipping, let you know how that goes they should be back the week after
Ikea delivered the kitchen at 7.30 am Saturday and by Sunday afternoon all the base cabinets were in place, plumbing for the sink and waste sorted, the dishwasher fitted the intended gap but only just,that was touch and go for a while
Oh almost forgot the TV aerial was erected on chimney on Sunday morning
Problems this week drilling 20 mm holes in the tile where the pipes feed the shower control, managed to break one tile, so we have sent off for a diamond drill, lets see how we get on with that
A lot more sanding and painting this week, the original wood around door frames and the staircase have come up very nicely after cleaning off many layers of paint, the doors go away this week for dipping, let you know how that goes they should be back the week after
Ikea delivered the kitchen at 7.30 am Saturday and by Sunday afternoon all the base cabinets were in place, plumbing for the sink and waste sorted, the dishwasher fitted the intended gap but only just,that was touch and go for a while
Oh almost forgot the TV aerial was erected on chimney on Sunday morning