A lot has been happening since the happy couple moved in, it has been all those little jobs
At last this week the bathroom vinyl is being fitted, it had to be put on hold until we found out what was leaking water under the floor, it was a small water leaking in the sink waste,which has now been fixed.
The outside lighting has been installed along with 3 CCTV cameras just to keep an eye on things. Most of the doors now have the architrave fitted,along with handles and latches.
The large walk in wardrobe has been fitted out with hanging rails and shoe racks
In a couple of weeks all the fascia and guttering will be replaced, along with a roof support in what was the outside loo, then the ceiling in there can be insulated and covered
Terry
At last this week the bathroom vinyl is being fitted, it had to be put on hold until we found out what was leaking water under the floor, it was a small water leaking in the sink waste,which has now been fixed.
The outside lighting has been installed along with 3 CCTV cameras just to keep an eye on things. Most of the doors now have the architrave fitted,along with handles and latches.
The large walk in wardrobe has been fitted out with hanging rails and shoe racks
In a couple of weeks all the fascia and guttering will be replaced, along with a roof support in what was the outside loo, then the ceiling in there can be insulated and covered
Terry