House Update #19

maltrab

Administrator
Staff member
A lot has been happening since the happy couple moved in, it has been all those little jobs
At last this week the bathroom vinyl is being fitted, it had to be put on hold until we found out what was leaking water under the floor, it was a small water leaking in the sink waste,which has now been fixed.
The outside lighting has been installed along with 3 CCTV cameras just to keep an eye on things. Most of the doors now have the architrave fitted,along with handles and latches.
The large walk in wardrobe has been fitted out with hanging rails and shoe racks

In a couple of weeks all the fascia and guttering will be replaced, along with a roof support in what was the outside loo, then the ceiling in there can be insulated and covered

Terry
 
Are you going on holiday when this is all done?

I do hope so at some point, though I am waiting for a new hospital appointment that had been cancelled,though I have called them twice I can get no idea when this may be, and the chances of it coming right at the time I book somewhere are always high
 