I thought I would bring you up to date with what is happening at my daughters house. A lot of internal tidying up has been done, a few new internal doors fitted, the Gas man called and fitted some home automation kit so they can control the boiler and heating from wherever they are via their smartphones.
Over the last few weeks a lot of work has been done in the garden to prepare for a garage to be erected at the end of this month, this entailed moving a lot of earth, laying a concrete base, reinforcing the walls that hold back the banking, digging trenches for mains cables and drainage.
Once the garage is there, it has to be insulated, the electrics installed,then they can move a lot of stuff that has been in expensive storage for the last 6 months.
Then before the winter sets in the small conservative which is badly fitted in UPVC and leaks will be replaced with a timber built frame, double glazing, a tiled roof and a new door, so they will be all set for a snug winter, I will post some pictures as work progresses.
Over the last few weeks a lot of work has been done in the garden to prepare for a garage to be erected at the end of this month, this entailed moving a lot of earth, laying a concrete base, reinforcing the walls that hold back the banking, digging trenches for mains cables and drainage.
Once the garage is there, it has to be insulated, the electrics installed,then they can move a lot of stuff that has been in expensive storage for the last 6 months.
Then before the winter sets in the small conservative which is badly fitted in UPVC and leaks will be replaced with a timber built frame, double glazing, a tiled roof and a new door, so they will be all set for a snug winter, I will post some pictures as work progresses.