Not a lot been happening as the plumber was called back to Yorkshire due to domestic problems,we did manage to get more of the wiring sorted, the new flooring for the bathroom delivered along with the underfloor insulation,but with every room having floors lifted up and pipework everywhere we have not managed much progress, it is hoped the plumbing will be finished by Wednesday 25th,with the boiler being commissioned on Thursday,so at least we can have some heat running through the house,following that it will be all hands on deck to try and catch up a little