We have not done much over the last couple of weeks, due to illness and the Christmas break,but we have been back for the last couple of days, the attic has been emptied of all the old insulation which was rotting away and having little effect, 10 new recessed lights have been installed in the kitchen ceiling, and a new floor in the bathroom fitted.
It is hoped by the end of the coming week, the electrics in the dining room will be done, along with insulation and a new floor
We are still waiting a start date to replace all the double glazing
It is hoped by the end of the coming week, the electrics in the dining room will be done, along with insulation and a new floor